Power up your daily routine.
Build Habit Power every day and watch your daily routine grow stronger. A private habit tracker for iPhone, iPad, Mac and Apple Watch, with Apple Health built in.
Coming soon to the App Store
Habit Power
Habit Power shows how established a habit is, based on your last 30 days. Every habit starts at zero and charges as you complete it. The stronger your habits, the stronger your routine.
Beyond Your Rings
Steps, sleep, water, daylight, mindfulness and more. Pick what Apple Health already tracks, set your daily goal, and it becomes a habit that completes itself on the days you meet it.
-
Progress
Earn XP, grow your Routine Score and see your progress in charts, recent trends and highlights.
-
Daily reminder
A gentle nudge or a silent, must-dismiss alarm on iPhone and Apple Watch, at a chosen time, only for what is still open.
-
Every device
Use Kyro on iPhone, iPad, Mac and Apple Watch, or complete habits from a widget, with Siri or in Shortcuts.
-
Streak freeze
Sometimes life gets in the way, and losing a long streak over a miss you didn’t choose feels unfair. Apply a streak freeze so your streak keeps going and the record stays honest.
-
Time and Day
See at which hour of the day and on which days of the week you complete a habit most.
-
Pause and archive
Pause your routine for a trip or a rest, or archive a habit, and nothing you built is lost.
-
Import and export
Bring in the history of habits you already track from a CSV file, and export yours whenever you want.
Coming soon to the App Store
Private by design: no account, no tracking, no third-party ads, and private sync through your own iCloud.
Requires iPhone or iPad with iOS or iPadOS 26+. Also on Apple Watch with watchOS 26+, and on Macs with Apple silicon and macOS 26+.